Running the Close at a Commercial Solar EPC Firm
A commercial solar or energy EPC contractor closes around long, milestone-based projects that can run six to eighteen months from contract signing to interconnection. Percentage-of-completion accounting, investment tax credit tracking, change orders and retainage all move through that same long timeline, so here's a runbook for what needs to happen each month, and where FloQast or BlackLine step in.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Step One: Confirm the Percentage-of-Completion Inputs
Before anything else closes, the cost-to-complete estimate on each active project needs to be current, not carried forward from two months ago. On a solar EPC job, the biggest swings usually come from equipment delivery delays and utility interconnection timing, both of which push completion percentage around independently of labor progress. Neither FloQast nor BlackLine estimates cost-to-complete; that comes from your project management or ERP system, and the close checklist should force a monthly confirmation that the estimate was actually updated, not just re-saved.
Step Two: How Do You Track the Investment Tax Credit?
Projects qualifying for an investment tax credit carry a separate tracking requirement, since the credit is typically tied to when the project is placed in service, not when it's contracted or even substantially complete. A close process that doesn't flag which projects have crossed that placed-in-service threshold this month risks either recognizing the credit too early or missing the window to document it properly. This is a specific enough calculation that it usually sits with your tax advisor, but the close checklist should still carry a task confirming which projects hit that milestone each period.
Step Three: Reconcile Change Orders Before They Pile Up
Interconnection delays and utility requirements frequently generate change orders on solar projects, and an approved change order that hasn't been entered into the job-cost system yet understates both revenue and cost on that project's WIP schedule. A monthly check between the project team and accounting on which change orders are approved but not yet booked is the single most useful habit here, more valuable than either platform's own feature set.
Step Four: How Should Retainage Be Handled?
Retainage withheld until final interconnection and commissioning behaves the same way it does on a general construction job: it's earned revenue that isn't yet collectible, and it needs its own aging schedule separate from regular accounts receivable. Engineering and construction firms nationally run around 36 days of payables outstanding relative to sales1, a useful reference point for how EPC payment cycles compare to other sectors, though your own retainage terms with the owner are typically the bigger driver of collection timing.
Step Five: Choose the Platform Based on Entity and Project Count
A single-entity EPC firm running a handful of active projects at a time can build steps one through four into FloQast's checklist without a heavy lift. BlackLine earns its cost once you're running multiple entities, such as a separate development entity holding tax equity partnerships alongside the construction operating company, or once project count and change-order volume get high enough that manual tie-outs between project management and accounting start slipping every month instead of occasionally.
Step Six: Price the Staffing Alternative
A project accountant who can own the WIP roll-up, change order tracking and retainage aging directly costs somewhere in the national range for accountants and auditors, with the median at $83,680 and the 75th percentile at $109,8102. For an EPC firm running a small number of concurrent projects, one experienced hire running a disciplined manual process for a year or two is often the more practical step before either platform, buying time to see which specific gaps in the runbook above actually recur.
Step Seven: Watch Interconnection Timing Specifically
Utility interconnection approval is one of the few milestones on a solar project that's largely outside the contractor's control, and a delay there can push a project's completion percentage and its placed-in-service date by months without any change in the underlying construction work. A runbook that treats interconnection status as its own tracked item, separate from construction progress, keeps the WIP schedule honest about why a project's timeline moved, which matters when an owner or lender asks for an explanation of a schedule slip.
Step Eight: Build the Habit Before the Headcount
Whether you're running this close through a spreadsheet, FloQast or BlackLine, the habit that matters most is a standing monthly meeting between the project team and accounting where WIP inputs, change orders and interconnection status all get reviewed together, not separately. Firms that build this habit early tend to have a much smoother transition to either close platform later, because the underlying data discipline is already there; firms that skip it usually find that a new tool just makes the same disconnected process run on a nicer interface.
Put these items on the standing monthly agenda:
- Confirm the cost-to-complete estimate on each active project was actually updated, not just re-saved.
- List change orders that are approved but not yet booked in the job-cost system.
- Track utility interconnection status as its own item, separate from construction progress.
- Flag projects that crossed the placed-in-service threshold this month and review the retainage aging schedule.
What Good Looks Like
A solar or energy EPC contractor closes with cost-to-complete estimates refreshed monthly on every active project, investment tax credit milestones tracked and documented as they're crossed, and retainage aged separately from regular receivables with a current collection status.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Equipment vendors and subcontracted installation crews get paid on a predictable schedule when invoices and approvals route through BILL instead of a shared inbox.
A solar EPC firm running a mix of subcontracted crews across projects can use Tax1099 to handle year-end 1099 filing without chasing down TINs project by project.
Frequently Asked Questions
Does either close platform calculate the investment tax credit?
No. The credit calculation and the placed-in-service determination are tax questions that typically sit with your tax advisor. What a close checklist adds is a monthly task confirming which projects crossed the placed-in-service threshold, so the documentation gets captured while the project details are fresh.
How should retainage be tracked differently from regular receivables?
Retainage is earned revenue withheld under contract terms until a milestone, usually final commissioning, is met. It should sit on its own aging schedule rather than blending into regular accounts receivable, since its collection timeline is tied to project completion, not standard payment terms.
What triggers a move from FloQast to BlackLine for an EPC contractor?
Usually a second legal entity, such as a tax equity or development entity, or project and change-order volume high enough that manual tie-outs start missing things most months. Occasional misses don't justify the switch, but a consistent pattern does.
Sources
Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.
- Payables days (AP/Sales x 365) by industry (US). NYU Stern (Aswath Damodaran), Working Capital Ratios by Industry, US, 2026.
- Annual wage, Accountants and Auditors (SOC 13-2011), US all industries. BLS OEWS May 2025, 2025.
Related Guides
FloQast vs. AuditBoard for Commercial Solar EPC Contractors
Milestone billing, performance guarantees, and tax credit documentation drive an EPC contractor's close. Compare FloQast and AuditBoard for each.
BILL vs Tipalti for Commercial Solar and Energy EPC Firms
Following one solar project's payables shows where BILL and Tipalti fit equipment, subcontractor and permitting payments in EPC.
409A Valuation for a Solar or Energy EPC Contractor
Project-level tax equity, development pipeline, and module price swings all shape a solar EPC's 409A differently than a typical contractor. Here's how.
A Worked Example: Financing a Commercial Solar EPC's O&M Revenue
A worked look at where Pipe and Capchase do and don't fit a commercial solar or energy EPC business, split between project and O&M revenue.
A Solar EPC's Sales Tax Question, Worked Through One Project
Walk a commercial solar EPC project through equipment exemptions, real property treatment and multi-state registration before picking a compliance tool.
Payroll for Solar and Energy EPC Crews on Federal Projects
How a solar or energy EPC contractor handles Davis-Bacon prevailing wage and traveling crews across state project sites, and where Gusto and Rippling diverge.