AP & Spend Automation3 min readUpdated September 2026

BILL vs Tipalti for Commercial Solar and Energy EPC Firms

For commercial solar and energy EPC firms with domestically sourced equipment and a stable subcontractor bench, BILL fits well, while Tipalti adds value with international manufacturers or multiple project entities. Picture a 2-megawatt rooftop project: panels and inverters, a racking subcontractor and electrical crew, and utility and permitting fees all flow through the platform you choose.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why EPC payables don't behave like a typical services business

Most services businesses have a fairly steady payables rhythm: recurring overhead, a handful of vendors, predictable timing. An EPC contractor's payables instead move in bursts tied to a project's construction schedule, a heavy equipment payment at kickoff, a quiet stretch during permitting delays, a wave of subcontractor payments once construction actually starts. Whichever platform you choose needs to handle that unevenness without either bottlenecking during a payment-heavy week or sitting idle during a quiet one.

Equipment procurement: where international sourcing shows up

Panels and inverters are frequently sourced from manufacturers outside the US, even when a US distributor is the nameplate seller, and larger EPCs sometimes buy directly from an overseas manufacturer to hit project margins. If your equipment purchasing runs through a domestic distributor, BILL covers it without added complexity. If you're negotiating directly with international panel or inverter manufacturers, Tipalti's multi-currency payment handling and tax documentation collection remove a meaningful amount of manual work compared to routing those payments as one-off international wires.

Subcontractor crews: progress payments tied to milestones

Racking installation and electrical subcontractors on a project like this are usually paid in stages tied to physical progress, mechanical completion, electrical rough-in, final commissioning, rather than a single invoice at the end. Neither BILL nor Tipalti tracks project milestones natively, so the schedule of what's due at each stage needs to live in your project management system, with the AP platform handling the actual payment release once a stage is confirmed complete and approved.

Permitting and utility fees: small dollars, real deadlines

Permitting fees, interconnection application fees and utility charges are typically small relative to equipment and labor costs, but they're often tied to hard deadlines: miss a permitting fee payment and the project's interconnection timeline slips, which can cascade into missed incentive deadlines depending on the program. These are exactly the kind of low-dollar, high-urgency payments worth routing through a fast-track approval tier in either platform, similar to how a field service business handles emergency parts purchases.

What the numbers looked like on that 2-megawatt project

By the time that project reaches interconnection, the payables trail typically includes one or two large equipment purchases, several milestone-based subcontractor payments, and a handful of small permitting and utility fees, three very different payment shapes on one job. The general operations manager or project lead overseeing payables on a project like this typically earns in the $72,320 to $167,280 range depending on seniority and company size1, which is worth knowing when deciding how much of this coordination you can reasonably expect one person to own versus when it's time to split project financial administration across two roles.

Choosing a platform based on your project mix

A contractor running mostly domestic-sourced equipment and a stable subcontractor bench fits BILL's setup well. A contractor negotiating directly with international manufacturers on larger projects, or running payables across multiple project entities for financing or tax reasons, gets more value from Tipalti's broader configuration despite the heavier setup.

What changes once you're running several projects at once

A single project's payables are manageable in almost any system; the real test is a dozen projects at different stages simultaneously, one at permitting, several mid-construction, a couple at final commissioning, each generating its own mix of equipment, milestone and fee payments on its own timeline. At that point, whichever platform you use needs project-level tagging on every payable so a project manager can see their own job's payment status without digging through the whole company's AP queue, a need that grows faster than most contractors expect once the backlog fills up.

Setting up the fee fast-track without losing oversight

A fast-track approval tier for permitting and utility fees is only safe if it's bounded clearly: a set dollar ceiling, a defined list of fee types that qualify, and a monthly report of everything that went through the fast path so someone is still reviewing the pattern even though individual payments cleared quickly. Skipping that oversight step is how a fast-track exception meant for a small permitting fee quietly starts covering larger payments nobody meant to fast-track, and by the time anyone notices, the exception has effectively become the rule.

Guardrails for a fee fast-track tier:

  • Set a fixed dollar ceiling so only small permitting and utility fees can use the fast path.
  • Define the list of fee types that qualify, such as permitting and interconnection application fees.
  • Review a monthly report of everything that went through the fast path so someone still sees the pattern.
  • Keep equipment invoices on the fuller review that a larger purchase deserves.
Executive Capability Standard

What Good Looks Like

Good AP for a solar or energy EPC means equipment purchases, milestone-based subcontractor payments and urgent permitting fees each move through the approval path suited to their size and deadline, without permitting fees getting stuck behind larger invoices.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Learn which of your typical project costs are equipment, milestone-based labor, and urgent small-dollar fees, and their different timing needs.
2. Do Manually:Track subcontractor milestone payments against a project schedule in a shared sheet and approve each manually.
3. Delegate:Hand routine equipment and permitting bill entry to a project administrator, keeping milestone payment approval with a project manager.
4. Automate:Set up a fast-track approval tier in BILL for small, deadline-sensitive permitting and utility fees.
5. Buy:Move equipment purchasing onto Tipalti once direct international manufacturer relationships become a regular part of sourcing.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can BILL or Tipalti track subcontractor payment milestones on a solar project?

No, milestone tracking needs to live in your project management system. Both platforms handle the payment release once a milestone is confirmed complete and approved, but neither determines on its own whether a subcontractor has actually hit mechanical completion or another contractual milestone.

Is it worth using Tipalti just for occasional international equipment purchases?

Usually not. If most projects source equipment through a domestic distributor and international purchases are occasional, BILL's international wire option covers it. Tipalti pays off once direct international manufacturer relationships are a regular part of how you source equipment.

How should permitting and utility fees be handled differently from equipment invoices?

Route them through a fast-track, lower approval threshold given their urgency and relatively small dollar amounts, since a missed permitting deadline can delay a project's interconnection timeline far more than the fee itself would suggest. Equipment invoices, by contrast, usually warrant the fuller review a larger purchase deserves.

Sources

Where we quote a benchmark, we show its source. Other figures in this guide are estimates or general guidance, so check them against your own numbers.

  1. Annual wage, General and Operations Managers (SOC 11-1021), US all industries. BLS OEWS May 2025, 2025.

Related Guides